<Project>
APPENDIX B: REFERENCES
[Insert the name, version number, description, and physical location of any
documents referenced in this document. Add rows to the table as necessary.]
The following table summarizes the documents referenced in this document.
Document Name
Description
Location
<Document Name and
<Document description>
<URL or Network path where document
Version Number>
is located>
Work Breakdown Structure (v1.0)
Page 6 of 8
[Insert appropriate disclaimer(s)]