Application For Residential Certificate Of Occupancy - Department Of Building & Safety Engineering

Download a blank fillable Application For Residential Certificate Of Occupancy - Department Of Building & Safety Engineering in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Application For Residential Certificate Of Occupancy - Department Of Building & Safety Engineering with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

Fill this form out online before printing and signing. Then return it to the Building Department.
Livingston County
DEPARTMENT OF BUILDING & SAFETY ENGINEERING
2300 E. Grand River Ave., Suite 104, Howell, MI 48843-7580
517-546-3240
Fax 517-546-7461
APPLICATION FOR RESIDENTIAL CERTIFICATE OF OCCUPANCY
Upon completion of a building project this application and all necessary documents (listed below) must be completed and submitted
by the permit holder to the Livingston County Building Department (LCBD). There will be a minimum of 48 hours processing time
from the receipt date of all paperwork.
ALL FINAL INSPECTIONS RELATING TO THE PROJECT MUST BE COMPLETED AND APPROVED PRIOR TO
MAKING APPLICATION.
Property Address:___________________________________________________________
Permit Number:_______________________ Date:________________________________
Contractor:___________________________ Occupant Name:_____________________________
Driver’s License # of Contractor:_____________________________________________________
Please complete the following checklist and submit all necessary paperwork with this application. Note: Failure to provide all
necessary documents will render the application null and void.
A certificate of insulation for any blown cellulose insulation. A blank certificate is available from the LCBD counter.
Final health approval for the well and/or septic system from the Livingston County Health Department.
Outstanding fees must be paid prior to issuance. Fees are due in the amount of $__________________.
In addition to a land use permit, a final zoning compliance inspection is required if the project is located in one of the following
townships. The LCBD will notify the township that the project’s inspection process is complete. The township will then have 10
business days to inform the LCBD of any objections to a CO issuance. If the applicant does not wish to wait at least 10 business days
for a CO issuance, zoning compliance may be submitted to the LCBD in person, by mail or as a packet along with this application.
Your township must be contacted to order a final zoning inspection.
Hamburg
Phone #: (810) 231-1000
Handy
Phone #: (517) 223-3228
Cohoctah
Phone #:
(517) 546-0655
Howell
Phone #: (517) 546-2817, x117
Marion
Phone #: (517) 546-1588
Deerfield
Phone #: (517) 546-8760
V. Fowlerville
Phone #: (517) 223-3771
V.Pinckney Phone #
(734) 878- 6206
I would like to receive my CO by the following method(s):
U.S. MAIL; WILL BE MAILED TO PERMIT HOLDER
FAX:__________________________________________
HOLD FOR PICK-UP
IT IS UNLAWFUL TO USE OR OCCUPY A STRUCTURE WITHOUT A CERTIFICATE OF USE AND OCCUPANCY
UNDER MICHIGAN COMPILED LAW 125.1513.
All information submitted with this application is accurate to the best of my knowledge.
_______________________________________
_________________________________________
Signature
Printed Name
Day Time Phone Number ______________________________________
C:Documents and Settingslindal.000My Documentsuildingc of o application revised Oct 04.doc

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go