7. If a CEC has not been obtained, please provide:
i.
A conceptual Storm-water Management Plan for the site stating:
The temporary and permanent measures that will be implemented during the site preparation, construction and post-construction phases to
ensure that there is no net increase in peak runoff for a 1:25 rainfall event from the pre-development to the post-development phase
The pre-development flow value (Q m3/s) for the proposed site such that the existing volume of surface runoff for the site can be quantified
The description of any onsite measures that would be instituted to maintain the pre-development flow value during the construction and post-
construction phases of the proposed development
The proposed storm-water management measures can accommodate the post-development flow value and reduce it to the pre-development
flow value (Q m3/s)
Calculations for determining the pre-and post-development flow value (Q m3/s) for the proposed site
The drainage mechanisms
The storm-water retention/detention ponds, catchments, landscaping, etc
The proposed plans for the inspection and maintenance of any physical structures (e.g. detention/retention ponds, catchments, etc.) that may
be constructed on the site.
ii.
A Sediment and Erosion Management Plan for the site stating the:
Temporary and permanent measures that will be implemented during the site preparation, construction and operational phases of the
development
Possible measures such as, but not limited to, phased clearing, settling pond(s), filtering devices placed within drains and re-vegetation, that
will be implemented to minimise or prevent the movement or migration of sediments off site due to the proposed site activities.
iii.
A Monitoring and Reporting Plan for the Quality of Water Discharged from the site
iv.
The Mitigation Measures to be applied for dust pollution, noise pollution, emissions from equipment/vehicles, soil pollution, and fuel and oil
spills
_________________
____________________________
__________________________
Date
Authorised Signature
Name (block letters)
Page 9 of 9