7. If a CEC has not been obtained, please provide:
i.
A conceptual Storm-water Management Plan for the site stating:
 The temporary and permanent measures that will be implemented during the site preparation, construction and post-construction phases to
ensure that there is no net increase in peak runoff for a 1:25 rainfall event from the pre-development to the post-development phase
 The pre-development flow value (Q m3/s) for the proposed site such that the existing volume of surface runoff for the site can be quantified
 The description of any onsite measures that would be instituted to maintain the pre-development flow value during the construction and post-
construction phases of the proposed development
 The proposed storm-water management measures can accommodate the post-development flow value and reduce it to the pre-development
flow value (Q m3/s)
 Calculations for determining the pre-and post-development flow value (Q m3/s) for the proposed site
 The drainage mechanisms
 The storm-water retention/detention ponds, catchments, landscaping, etc
 The proposed plans for the inspection and maintenance of any physical structures (e.g. detention/retention ponds, catchments, etc.) that may
be constructed on the site.
ii.
A Sediment and Erosion Management Plan for the site stating the:
 Temporary and permanent measures that will be implemented during the site preparation, construction and operational phases of the
development
 Possible measures such as, but not limited to, phased clearing, settling pond(s), filtering devices placed within drains and re-vegetation, that
will be implemented to minimise or prevent the movement or migration of sediments off site due to the proposed site activities.
iii.
A Monitoring and Reporting Plan for the Quality of Water Discharged from the site
iv.
The Mitigation Measures to be applied for dust pollution, noise pollution, emissions from equipment/vehicles, soil pollution, and fuel and oil
spills
_________________
____________________________
__________________________