Mine Design Plan Template - Ministry Of Energy And Energy Affairs Page 6

ADVERTISEMENT

State the method for the storage of topsoil and overburden:
If applicable, state the method and rate of de-watering of the mine:
State the method of extraction of aggregate:
State the RATE of extraction of aggregate (cubic yards/cubic metres per day/month) :
Parameter
For any BERMS to be constructed
For any BENCHES to be constructed
Maximum height (ft / m)
Maximum width (ft / m)
Minimum width (ft / m)
Maximum gradient / slope (ratio / angle in degrees)
Page 6 of 9

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal
Go
Page of 9