SAFE WORK METHOD STATEMENT
Clifford Constructions P/L
Phone: 02 9482 7288
SWMS No.________
8/35 Leighton Place
Fax: 02 9482 7037
Hornsby NSW 2077
Email: .au
RISK MATRIX
Likelihood/Probability
Level
Description of Consequence or Impact
Consequence
L
M
U
Likely
Moderate
Unlikely
Potential death, permanent disability or major structural failure/damage.
H (1)
H (1)
Off-site environmental discharge/release not contained and significant
1
1
2
(High Level of Harm)
High
long-term environmental harm.
Potential temporary disability or minor structural failure/damage. On-site
M (2)
M (2)
environmental discharge/release contained, minor remediation required,
1
2
3
(Medium Level of Harm)
(Medium)
short-term environmental harm.
Incident that has the potential to cause persons to require first aid On-site
L (3)
L (3)
environmental discharge/release immediately contained, minor level clean
2
3
3
(Low Level of Harm)
(Low)
up with no short-term environmental harm.
LEVEL
LIKELIHOOD/PROBABILITY
Likely
Could happen frequently
Moderate
Could happen occasionally
Unlikely
May occur only in exceptional circumstances
CONTROLS CONSIDERED TO MANAGE RISKS
Elimination
Substituting
Isolating
Engineering
Administration
PPE
Revision: 1
SWI011.01
Approval Date:04/06/2014
Page 3 of 13