PART I. DESK REVIEW –The Reviewer must complete this section prior to the on-site review using all relevant information in project files and HUD database
systems. Questions on the desk review, which include category references, are linked to the on-site review. Category references on the desk review that relate to the
on-site review must be considered when determining the category rating. Category references are marked following the applicable question (i.e. B3, E14).
If any questions on any given form are not relevant to the program under review or if the information is not available notate with “N/A”.
B3
1. What is the most recent Physical Assessment Subsystem (PASS) score?
Enter PASS Score
Date of REAC inspection
If required, has the project filed a certification that all items listed on the previous REAC inspection have been completed? If more than one inspection is of record, does
the reviewer note repetitive defects?
Yes
No
Comments:
B3
2. Were Exigent Health and Safety (EH&S) conditions cited in the report?
Yes
No
Comments:
3. Have all latent defects been corrected? (This question applies only to newly constructed projects within the last 24 months.) (This question applies only to HUD
Staff/Mortgagees.)
Yes
No
N/A
If not, list depository and amount of any construction escrows remaining.
Comments:
Questions 4 through 6 only apply to subsidized family properties or elderly properties housing children under the age of six that were constructed prior to
1978. If the lead based paint inspection has been conducted and the information was documented on the previous management review, proceed to question 7.
4. Document year of construction for Lead-Based Paint compliance. (Obtain this information from the Physical Condition/PASS screen in REMS Open REAC
Inspection Report, then open the PASS Physical Inspection Report. The year of construction can be found under Buildings/Units .)
Date of Construction
(If constructed after 1977, proceed to question 7.)
4B
5. Has a lead-based paint inspection been conducted?
Yes
No
Information Not Available
Comments:
4B
6. What were the results of the Lead-Based Paint Inspection/Evaluation?
Lead Found?
Yes
No
If yes, is there a HUD approved lead hazard control plan?
Yes
No
Comments
7. Is an Annual Financial Statement required? (If no, proceed to question 10). (This question applies only to HUD Staff.)
Yes
No
Comments:
Page 1 of 25
form HUD-9834 (6/2009)
Ref. HUD Handbook 4350.1, REV-1
and HUD Handbook 4566.2

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal