Commercial Permit Application Form Page 2

Download a blank fillable Commercial Permit Application Form in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Commercial Permit Application Form with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

COMMERCIAL WORKSHEET
(PLEASE TYPE OR PRINT CLEARLY)
ELECTRICAL INFORMATION: Electric Required? Yes______ No______ Existing Service?______ New Service?______ Upgrade Service?______
Limited Use?_______ Disconnect/Reconnect?______ Temporary Underground?_______ Temp Pole: Yes______ No______
Service Size: NEW Amps
Number New/Altered Circuits
______________
Electric Company
. __________________________________
_______________
Volts
Phase 1PH
3PH
OLD Amps
Volts
Phase 1PH
3PH
___________
________
________
______________
__________
_________
_________
MECHANICAL (HVAC): Required? Yes_____ No_____ Electric
Gas
Oil
Heat Pump
A/C
General?____
_____
_____
______
_____
______ Duct Work?______
Roof Top Equipment?______ Type of Equipment:________________________________ Equipment Location: Inside_____ Outside ______
Type of Heating System_______________________________ No. of BTU’s____________ Type of Cooling System____________________________
No. of Tons_______
.00
Declared HVAC Costs
PLUMBING INFORMATION: Plumbing Required? Yes_____ No_____ # of Plumbing Fixtures
Sewer/Septic Connection____
____
Utility Connection____ Well Connection____ Piping?____ Water Heater?____ Connection?____ Backflow Preventer?___ General? _____
Water Source____________________________ Water Company_____________________________________________
Sewer Source____________________________ Sewer Company____________________________________________
GAS INFORMATION: Gas Required? Yes_______ No_______ Type of Gas: (LP or Natural)____________________________
Tank Location: Above Ground
/Underground
Number of Gas Outlets
___________
___________
______________
ROOF INFORMATION: TYPE OF ROOF: Shingle
*Metal
*Tile
*Other
______
______
______
______________________________________________ Sloped_____
Low Sloped_____ Combination_____
* These roof types requires a licensed roofer (except for owner/builders)
FIRE INFORMATION: Fire Alarm Required?_______ Fire Protection Required?______ Sprinklers Required?______ Fire Alarm Provided?______
Sprinklers Provided?_______
Sprinkler Heads
Declared Fire Alarm Cost $
.00 Standpipes ________
____________
Siamese Connections_____ Roof Manifold Lines________
FLOOD ZONE: If the building is located in a 100 year Flood Hazard area (A, AE, AH, V), a FEMA Flood Certification form is required.
Flood Zone X_______ V_______ A_______ BASE FLOOD ELEV (A or V)__________Min Floor Elev___________.00
TREE CLEARING INFORMATION:
One Site Plan required showing the area to be cleared & location of tree protection barrier.
Tree Information: Lot size: Square Feet ________________________ Frontage __________________ft Depth ___________________ft
USE PERMIT INFORMATION:
One Site Plan required showing width of drive at property line & edge of road
***Pursuant to Chapter 556, Florida Statutes, as amended,
.
an excavator shall call 811, () before beginning excavation. The process takes 2 full business days. Day 1 starts the day after you call.***
Driveway? Yes_______ No________ Connected to Road Type: City _______
County _______ Private _______ State _______
Number of Culvert Pipes __________
Size ______________ Driveway approach to: Paved Rd ________ Unpaved Rd ________
CONSTRUCTION COSTS: DECLARED PROJECT COST: (Include labor & materials) $
.00
PERMIT INFORMATION: Permit to Complete? ________ After the Fact Permit? _______ Change of Use? ______ Additional Parking?_________
Primary Occupancy
Number of Dwelling Units
Number of Stories
Ground Floor Habitable?
_________________________________
_________
_________
________
Primary Use Area
Garage Area (Sq Ft)
Other
(Sq Ft)_________________________
___________________________
Area (Sq Ft)_________________________
Will the lowest floor level be 12” above any adjacent roads? Yes________ No________
TIED/RELATED PERMIT: TREE_________________________ USE__________________________ WETLAND____________________________
OTHER____________________________WELL PERMIT #_________________________________ SEPTIC PERMIT #_____________________________
ADDITIONAL STRUCTURES? Yes_____ No_____
Structure 1: ____________________________________________/__________________________sq ft
Structure 2: ____________________________________________/__________________________sq ft
Structure 3:____________________________________________/___________________________sq ft
Structure 4: ____________________________________________/__________________________sq ft
Structure 5: ____________________________________________/__________________________sq ft
Declared Construction Cost (Attached Structures Only
$
.00
): (include labor & materials)
PROPERTY ACCESS: Directions to property (Physical Location)
__________________________________________________________________________________
_______________________________________________________________________________GATE CODE________________________
Bonding Company Name______________________________________________ Address_________________________________________________________
Mortgage Lender’s Name______________________________________________ Address_________________________________________________________
Arch’s/Engr’s Name__________________________________________________ Address_________________________________________________________
July 2015
APPROVED BY _________________ (PERMIT OFFICER)

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go
Page of 2