CICB Monthly Rope & Hook Checklist
**This form shall be used for each piece of rope.**
Rope Description:
Mfr. Breaking Strength:
Application:
Inspection Points
Month
W i r e R o p e
Jan.
Feb.
Mar.
April
May
June
July
Aug.
Sept.
Oct.
Nov.
Dec.
Parts of Line
B30.2-2.4.2 & 1910.179 (m)(1)
Nominal Diameter
B30.2-2.4.2 & 1910.179 (m)(1)(i)
Measured Diameter
B30.2-2.4.2 & 1910.179 (m)(1)(i)
Rope Damage
B30.2-2.4.2 & 1910.179 (m)(1)(vi)
Broken Wires (1) Strand / (1) Lay
B30.2-2.4.2 & 1910.179 (m)(1)(ii)
Broken Wires (1) Lay
B30.2-2.4.2 & 1910.179 (m)(1)(ii)
Broken Wires at End Fittings
B30.2-2.4.2 & 1910.179 (m)(1)(ii)
Wear
B30.2-2.4.2 & 1910.179 (m)(1)(iii)
Corrosion
B30.2-2.4.2 & 1910.179 (m)(1)(iv)
H o o k
Safety Latch
B30.10-1.2.1.2 (c)(5) & (7)
Deformation/Twists
B30.10-1.2.1.3 (c)(1)
Deformation/Throat Opening
B30.10-1.2.1.3 (c)(2)
Wear - Bowl
B30.10-1.2.1.2 (c)(2)
Wear - Eye
B30.10-1.2.3 (b)(2)
Cracks, Nicks, Gouges
B30.10-1.2.1.2 (c)(3)
Attachment Points
B30.10-1.2.1.2 (c)(6)
Self-Locking Operation
B30.10-1.2.3 (b)(5)
Inspector's Signature ________________________________________________
If this crane is not utilized on a date, draw a vertical line through the column.
Please Note - An inspector/operator is responsible to bring Unsatisfactory items to the attention of his/her supervisor and/or maintenance department. CICB has
put this Monthly Checklist together as a guide and the operator/inspector should always refer to the manufacturer to ensure that all required items are being
inspected at the proper frequency.